Category Archives: Civil Method Statements

Method Statement for Piling Work using the Diesel Hammer

Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor. The surveyor will also be responsible for accurate survey location during erection and… Read More: Method Statement for Piling Work using the Diesel Hammer »

Steel Bar Reinforcement Rebar Fabrication and Installation Method Statement

The purpose of this civil work method statement is to cover the activities involved in the fabrication and installation of the steel reinforcement rebar in the project considering the quality and safety requirements. Scope of the method statements covers the activation of the rebar shop drawings and on site activities and does not cover the… Read More: Steel Bar Reinforcement Rebar Fabrication and Installation Method Statement »

Formwork Shuttering Installation Method of Statement

The purpose of this civil work method statement is to lay down the systematic procedures for the various activities required for reliable formwork to ensure that all works are carried out according to the designed drawings and Technical/Contract specifications. Scope of this method statement shall apply to all the Formworks/Shuttering at a construction project. The… Read More: Formwork Shuttering Installation Method of Statement »

Dozer Operation – Construction Equipment Safety Procedure

The purpose of this standard construction equipment safety procedure is to provide safe operating instructions for dozer operators working on any kind of construction or road projects. Project director is overall responsible for the implementation of this standard procedure. Authority to Operate a) All dozer operators must: i. hold a valid, project and equipment specific… Read More: Dozer Operation – Construction Equipment Safety Procedure »

Concrete & Paving Demolition Method Statement

The purpose of this safework method statement is to define the rules and conditions designed to ensure that concrete and paving demolition work is planned so as to enable personnel to be aware of all the procedures and dangers involved and to decide on the safest method of work. A detailed survey shall be conducted… Read More: Concrete & Paving Demolition Method Statement »

Construction of Bored Cast-in-Situ Piles Best Method Statement

Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual project site requirements. The piles will be of a nominal specified diameter, bored… Read More: Construction of Bored Cast-in-Situ Piles Best Method Statement »

Block Wall Construction Control Procedure for Blockwork

This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out in accordance with the project specifications. In any circumstance where specifications are not… Read More: Block Wall Construction Control Procedure for Blockwork »