2015
Aug
5

Method Statement For Installation of GI Conduits For Electrical Works

Following tools shall be required for performing the installation of GI Conduits for electrical works. Portable hand tools. Portable Drilling Machine/ Grinding Machine Spirit Level Level Threads G.I. Conduit bending and threading equipment INSTALLATION PROCEDURE FOR INSTALLATION OF GI CONDUITS Ensure that

2015
Aug
5

Safe Work Method Of Statement For Installation of Fire Alarm FA System

1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Fire Alarm FA System through the guide line contained herein so as to ensure that the job execution

2015
Aug
5

Method Of Statement For Installation of Earthing, Bonding & Lightning Protection System

method statement for earthing system installation pdf

1.0 PURPOSE The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Earthing, bonding & Lightning protection system through the guidelines contained herein so as to ensure that the job execution complies

2015
Jul
12

Method Statement For Installation Of CCTV Camera System

Following tools shall be required to perform the installation of CCTV system. Digital Multimeter Label Printer Drill Machine Ladders Crimping Tool General Tool Box Portable Hand Tools MATERIAL HANDLING & STORAGE: CCTV material at site necessary precautions shall be taken for unloading,