Upon arrival at site, the Fire Fighting pumps shall be off-loaded carefully at site using necessary manpower and required equipment to ensure that no damage is caused. The Fire Fighting pumps shall be preferably shifted directly to the pump room immediately upon arrival at
Read Full Method Statement
List of tools required for VESDA system testing and commissioning which should be arranged before starting the work. Portable Hand tools Step Ladder Insulation Resistance Tester Continuity tester Precommissioning Procedure for VESDA System Check the location of installation of the panel is
Read Full Method Statement
Below is the procedure for Testing & Commissioning of Jockey Pumps for the Fire Fighting System. Pre Commissioning Procedure for Fire Fighting Jockey Pumps Ensure that the pump installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion
Read Full Method Statement
The purpose of this procedure is to define the step by step method to implement the correct practices for the performance of Integrity Test for the proper functioning of fire suppression system through the the guidelines contained herein so as to ensure that the
Read Full Method Statement
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Fire Fighting System” through the guidelines contained herein so as to ensure that the job execution complies with the project requirements
Read Full Method Statement