This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of
Read Full Method Statement
Below is a precise method statement for fire hose reel testing and commissioning part of project fire fighting system. Automatic wet system is a system that is attached to a water supply capable of supplying the system demand at all fires and
Read Full Method Statement
The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for
Read Full Method Statement
Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for
Read Full Method Statement
Required Tools/Equipment Multimeter Detector Testing Tool Hilti Machine Drill Machine Pull string Step Ladders Mobile Scaffold Preparation Work Before Installation With the aid of computer software program design the system and prepare isometric drawing. Prepare layout drawing of piping network system and mechanical
Read Full Method Statement