Below is a basic first aid procedure that describes first aid requirements for the workplace mainly on a construction project and offices. Over all project head i.e. project manager or Project director is responsible for implementation of this standard procedure in coordination
Read Full Method Statement
Below is a precise Job Safety Analysis JSA for Lifting Activity that includes the loading and unloading of materials using Crane and Boom Truck. JOB STEPS POTENTIAL HAZARD(What can cause harm?) CONTROL MEASURE(What can be done to prevent it from going wrong?)
Read Full Method Statement
The purpose of this method statement is to provide guidance and recognition for the management, use and control of compressed gas cylinders on a construction project site. Overall project manager have responsibilities for the implementation of this standard safety procedure. Gas cylinders
Read Full Method Statement
This safework procedure helps to provide guidance in carrying out the necessary measures to avoid flooding during testing and commissioning activities at the construction project. Purpose of this method statement is to control the water flooding that may occur during commissioning activities.
Read Full Method Statement
This site hse procedure shall ensure safe and efficient operation of light vehicles movement of the organization. Safety instruction does not fully detail each specific requirement operators will encounter on their daily assignments. This guide provides competent light vehicle operators with critical
Read Full Method Statement