This repairing method statement applies to all concrete repair of the following types. Major Repair: For all concrete repairs to be carried out as per manufacturer’s recommendations and shall be applied by trained personal as per consultant instructions. For all major concrete
Read Full Method Statement
This Method Statement outlines methodology and acceptable parameters for all activities for construction of Pile cap foundations for the project building. In addition this method covers types of plants and machinery, sequence and area of works, testing (Quality Control), health and safety.
Read Full Method Statement
Major hazards while working at height and inside the shafts are falling from height, falling objects and collapse of structure. Below is the precise list of control measures that are applicable for working at height inside shafts and working inside the risers.
Read Full Method Statement
The procedure below covers the Hazard Identification and Risk Assessment that involves on the project sites related with the operation and maintenance of heavy earth moving plant and machineries. Earthmoving usually involves the operation of large, heavy and cumbersome vehicles in an
Read Full Method Statement
Welding symbols, like sign posts are informational directors. They are placed on welding drawings by welding engineers and their purpose is to relay information to the welder. In many instances the information relayed is very simple. Welding symbols are used on blueprints
Read Full Method Statement