2022
Nov
29

Steel Bar Reinforcement Rebar Fabrication and Installation Method Statement

Quality Plan for Reinforcing Bars

The purpose of this civil work method statement is to cover the activities involved in the fabrication and installation of the steel reinforcement rebar in the project considering the quality and safety requirements. Scope of the method statements covers the activation of

2022
Sep
5

Formwork Shuttering Installation Method of Statement

Formwork Shuttering Installation Method of Statement

The purpose of this civil work method statement is to lay down the systematic procedures for the various activities required for reliable formwork to ensure that all works are carried out according to the designed drawings and Technical/Contract specifications. Scope of this

2022
Jun
21

Risk Assessment for Drainage Pipes Installation

risk assessment matrix for evaluating the risk

Construction and HSE team must ensure that hazard identification is complete before start of the drainage piping work. The construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well established legal

2022
May
18

Stainless Steel Piping Fabrication SS Piping Method Statement

Touchup Paint Method for Protective Painting and Coating of Piping and Supports

The purpose of this piping fabrication procedure is to provide guidelines to carry out all the activities in a systematic way for fabrication and erection of stainless steel piping and to ensure that all concerned personnel have the common understanding to achieve