DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when
Read Full Method Statement
1.0 PURPOSE: This procedure is describing to clear the method of the supply and installation of audio visual AV system for the project. 2.0 SCOPE: This document details the A/V system Installation, Preparation of work, Delivery and inspection upon arrival of material at site and on
Read Full Method Statement
Programs of work for the Installation of Glazing Panels to GRP Fin shall follow the Planning and Programming of the Main Contractor. In event of any major changes in execution or shift in milestones of work schedule could occur, revised method statement
Read Full Method Statement
Procedure and safe work method statement for installation of Wall padding panels. Below is only step wise procedure and complete method statement will have all sections like scope, references, responsibilities, ITP, Checklists and risk assessments. Description of Activity Preparation of the Sub
Read Full Method Statement
Below is a detailed procedure for the installation of Premix Plaster, which is good to understand the way of work. Description of Activity: Surface Preparation The fair faced concrete background should be thoroughly cleaned devoid of dust, loose particles, wood pieces, mould oil
Read Full Method Statement