The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Bus Bar System”. Through the guidelines contained herein so as to ensure that the job execution complies with the
Read Full Method Statement
The purpose of this procedure or safe work method of statement is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Building Management System“. Through the guidelines contained herein so as to ensure that the
Read Full Method Statement
DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when
Read Full Method Statement
1.0 PURPOSE: This procedure is describing to clear the method of the supply and installation of audio visual AV system for the project. 2.0 SCOPE: This document details the A/V system Installation, Preparation of work, Delivery and inspection upon arrival of material at site and on
Read Full Method Statement
Programs of work for the Installation of Glazing Panels to GRP Fin shall follow the Planning and Programming of the Main Contractor. In event of any major changes in execution or shift in milestones of work schedule could occur, revised method statement
Read Full Method Statement