Safety Requirements for Installation of Upper Floor Wall Frames

Safe Work Method Statement for Installation of Upper Floor Wall Frames

The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures

2020
Apr
1

SWMS for Installation of Upper Floor Sheet Flooring for Joist Spacing up to 600mm

SWMS for Installation of Upper Floor Sheet Flooring for Joist Spacing up to 600mm

Before implementing this or any SWMS it must be checked and adjusted to suit a person’s individual work method, as long as hazards are identified and controlled. You may need to add additional steps to suit particular work environments and circumstances. The