Below is excavation swms safe work method statement for performing the excavation work for different purposes like piping, service trenches, manhole and cable laying including building construction work etc. The procedure is given in main steps and other considerations must be kept
Read Full Method Statement
Safe work method statement for back filling of the excavation area is provided in steps as below. Ensure all clearances from the concerned Government Department obtained. Selected working area should be barricaded to avoid accidents. Ensure suitable access / safe ramps provided
Read Full Method Statement
Table of Content General Construction Sequence List of Equipment List of Manpower Construction Method HSE Control Quality Assurance GENERAL Site preparation is one of the preliminary works to be done for starting construction works. The selected construction site preparation need to be
Read Full Method Statement
The installation of sheet piles are the famous type of temporary works for the construction of building or bridge during foundation works such as pilecap structural. Steel sheet piles are long structural sections with a vertical interlocking system that creates a continuous
Read Full Method Statement
Description of the material EpoCrete 100W is a two-component, water dispersible, non-toxic, clear, epoxy coating with excellent resistance to abrasion and moisture. EpoCrete 100W does not contain any volatile organic compounds and is a safer and more environmentally friendly alternative to conventional
Read Full Method Statement