Step wise guide on how to install resin flooring method statement is given below: No. Description of Activity Responsibility 1.0 Obtain necessary clearances and approvals from Engineers including MEP clearance for existing underground utilities MEP/PE/SE 2.0 Selected working area should be barricaded
Read Full Method Statement
Below is given in steps the method Statement for Liquid Water proofing for Wet areas in a building project. Preparation for Work Clean all surfaces free of dust, laitance, foreign material etc, by stiff wire brushing. oil and grease should be cleaned
Read Full Method Statement
Method Statement for installation / application of External Water Proofing Membrane for Swimming Pool and Water Tanks. Ensure Material for water proofing membrane approved prior to fixation. Membrane must be stored in shaded area with ambient temperature of less than 35 ยบ
Read Full Method Statement
The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for
Read Full Method Statement
If you are looking for combination of safework method statement for construction works with risk assessments then you are at right place. This website provides tons of safe work method statements that are editable and reusable by the people like you who