Method Statement for Earth Work Including the Preparation of Formation Level

Method Statement for Earth Work Including the Preparation of Formation Level

The purpose of this civil work method of statement is to define the procedures to ensure that the proposed materials and workmanship to be used at the site are complying with the condition / requirements as stipulated in the project earthwork specifications.

2022
Sep
5

Formwork Shuttering Installation Method of Statement

Formwork Shuttering Installation Method of Statement

The purpose of this civil work method statement is to lay down the systematic procedures for the various activities required for reliable formwork to ensure that all works are carried out according to the designed drawings and Technical/Contract specifications. Scope of this

2022
Jul
3

Safe Work Method Of Statement For Dewatering Work

This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data:  Water Table level :  m

2022
Apr
22

Dozer Operation – Construction Equipment Safety Procedure

Dozer Operation - Construction Equipment Safety Procedure

The purpose of this standard construction equipment safety procedure is to provide safe operating instructions for dozer operators working on any kind of construction or road projects. Project director is overall responsible for the implementation of this standard procedure. Authority to Operate