PART-1 GENERAL: WORK INCLUDED: Compliance with relevant General Requirements of Mechanical Services. 1.2 DESCRIPTION OF WORK: This Section includes piping supports complete for all piping systems except as otherwise specified. 1.3 Reference Standards. Heating & Ventilating Contractors Association recommendations BS 3974 Specification for pipe
Read Full Method Statement
This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of
Read Full Method Statement
Below document covers FCU installation method statement that covers steps to install FCU units of ducted and DX type air conditioners. By following this HVAC method statement contractor shall ensure that the job execution complies with the project specification and manufacturer requirements
Read Full Method Statement
The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for
Read Full Method Statement
This mechanical HVAC method statement covers the Air Leakage Testing of Metal Ductwork. Procedure defines the method used to ensure that the hvac ductwork has been manufactured and installed with all required seals to suit the specified pressure classifications. The method also
Read Full Method Statement