Category Archives: HVAC Method Statements

Stainless Steel Piping Fabrication SS Piping Method Statement

The purpose of this piping fabrication procedure is to provide guidelines to carry out all the activities in a systematic way for fabrication and erection of stainless steel piping and to ensure that all concerned personnel have the common understanding to achieve the highest quality of workmanship and the safe execution of the ss piping… Read More: Stainless Steel Piping Fabrication SS Piping Method Statement »

Pump House / Pump Room Piping & Pumps Installation Method Statement

Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for the installation and testing of piping to achieve the best quality of work.… Read More: Pump House / Pump Room Piping & Pumps Installation Method… »

Method Statement for External Protective Coating of Steel Pipes and Fitting Joints

This document covers works for the external coating of steel pipes and fitting joints and tests along with a recommendation of generic material types. All the inspection will be performed in accordance with the ITP for field external coating roof steel pipe fittings and joints. Inspections should be performed by QC inspectors who are certified… Read More: Method Statement for External Protective Coating of Steel Pipes and… »

Close Control Unit CCU Installation Method Statement

Unless otherwise specified, all close control unit installation shall be in accordance to approved shop drawings and contract specifications, drawing plans, schematics, and diagrams indicate general location and arrangement of closed control unit. The Project Manager is the overall responsible person for the process implementation of the ccu installation works. The Construction Manager/Site Mechanical Engineer… Read More: Close Control Unit CCU Installation Method Statement »

Procedure for the Installation of Ventilation Fans

Requirement of Tools for Installation of Ventilation Fans Following tools and equipment shall be arranged before starting the work of Installation of Ventilation Fans. Fork Lift or Crane with capacity & arrangement in line with the Manufacturer’s recommendations, pallet mover and as required at site. Hydraulic Trolley Portable hand tools Portable Drilling Machine/ Grinding Machine… Read More: Procedure for the Installation of Ventilation Fans »