Close Control Unit CCU Installation Method Statement

Unless otherwise specified, all close control unit installation shall be in accordance to approved shop drawings and contract specifications, drawing plans, schematics, and diagrams indicate general location and arrangement of closed control unit. The Project Manager is the overall responsible person for the process implementation of the ccu installation works. The Construction Manager/Site Mechanical Engineer… Read More: Close Control Unit CCU Installation Method Statement »

Procedure for the Installation of Ventilation Fans

Requirement of Tools for Installation of Ventilation Fans Following tools and equipment shall be arranged before starting the work of Installation of Ventilation Fans. Fork Lift or Crane with capacity & arrangement in line with the Manufacturer’s recommendations, pallet mover and as required at site. Hydraulic Trolley Portable hand tools Portable Drilling Machine/ Grinding Machine… Read More: Procedure for the Installation of Ventilation Fans »

Procedure for Installation of Chilled Water Pumps

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices of Installation of Chilled Water Pumps through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Following tools and… Read More: Procedure for Installation of Chilled Water Pumps »

Installation of Pressurisation Units & Chemical Dosing System

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Pressurisation Units & Chemical Dosing System through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level.… Read More: Installation of Pressurisation Units & Chemical Dosing System »

Method Statement for Installation of Grills, Diffusers, Registers & Louvers

The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Grills, Diffusers, Registers & Louvers through the guide line contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. Following tools and materials… Read More: Method Statement for Installation of Grills, Diffusers, Registers & Louvers »

Safe Work Method Of Statement For Installation Of Fan Coil Units FCU’s

Required tools for installation works: Following tools & equipment shall be arranged before installing the FCU’s. Fork Lift or Crane with capacity & arrangement in line with the manufacturer’s recommendations, pallet mover and as required at site. Hydraulic Trolley Portable hand tools. Portable Drilling Machine/ Grinding Machine & Angle Cutter. Spirit Level / Level Threads… Read More: Safe Work Method Of Statement For Installation Of Fan Coil… »

Method Statement for Testing & Commissioning of Calorifiers

The purpose of this method statement is to define the procedure for the on site commissioning of the Calorifiers. This method statement should be read in conjunction with the relevant method statement for installation outlining the responsibility and quality verification to be performed by various parties. Method Statement for Commissioning of Calorifiers The manufacturer’s commissioning Engineer… Read More: Method Statement for Testing & Commissioning of Calorifiers »