Category Archives: HVAC Method Statements

Installation of HVAC VCD Fire Smoke Dampers and Accessories

This Method Statement covers the HVAC dampers and Accessories horizontal and vertical installations. The procedure defines the method used to ensure dampers and accessories installation has been carried out as per standards, contract requirements, and best practices. Method statement gives details of how the ductwork will be carried out and what health and safety issues… Read More: Installation of HVAC VCD Fire Smoke Dampers and Accessories »

FCU Installation Method Statement ( Split Units Ducted & DX Type)

Below document covers FCU installation method statement that covers steps to install FCU units of ducted and DX type air conditioners. By following this HVAC method statement contractor shall ensure that the job execution complies with the project specification and manufacturer requirements and serves the intended function to satisfactory level. Responsibilities for implementation of this… Read More: FCU Installation Method Statement ( Split Units Ducted & DX… »

Basement MEP Coordination Shop Drawing Preparation and Checklist

The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for the cars in the driveway and parking as per the requirements of the… Read More: Basement MEP Coordination Shop Drawing Preparation and Checklist »

HVAC Duct Leakage Testing Procedure

This mechanical HVAC method statement covers the Air Leakage Testing of Metal Ductwork. Procedure defines the method used to ensure that the hvac ductwork has been manufactured and installed with all required seals to suit the specified pressure classifications. The method also gives details of how the work will be carried out and what health… Read More: HVAC Duct Leakage Testing Procedure »

Stainless Steel Piping Fabrication SS Piping Method Statement

The purpose of this piping fabrication procedure is to provide guidelines to carry out all the activities in a systematic way for fabrication and erection of stainless steel piping and to ensure that all concerned personnel have the common understanding to achieve the highest quality of workmanship and the safe execution of the ss piping… Read More: Stainless Steel Piping Fabrication SS Piping Method Statement »

Pump House / Pump Room Piping & Pumps Installation Method Statement

Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for the installation and testing of piping to achieve the best quality of work.… Read More: Pump House / Pump Room Piping & Pumps Installation Method… »

Method Statement for External Protective Coating of Steel Pipes and Fitting Joints

This document covers works for the external coating of steel pipes and fitting joints and tests along with a recommendation of generic material types. All the inspection will be performed in accordance with the ITP for field external coating roof steel pipe fittings and joints. Inspections should be performed by QC inspectors who are certified… Read More: Method Statement for External Protective Coating of Steel Pipes and… »