Category Archives: HVAC Method Statements

Testing & Commissioning Of Fan Coil Units FCU’s

This method of statement is prepared in order to define the step by step method to implement the correct practices for the pre commissioning & commissioning of FCU’s Fan Coil Units through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. REQUIRED… Read More: Testing & Commissioning Of Fan Coil Units FCU’s »

Method Statement & Specifications For Mechanical Sound, Vibration & Seismic Control Installations

DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when so requested by the Consultant. Specific mounting arrangements for each item of mechanical… Read More: Method Statement & Specifications For Mechanical Sound, Vibration & Seismic… »

Chilled Water Tank Exterior Insulation and Cladding Method of Statement

The scope of work involves supply and installation of exterior insulation and cladding of chilled water storage tank. Tools and Equipment: General insulation hand-tools including insulation cutters, band-tighteners, brushes, etc. General cladding hand-tools including Sheet metal shears, Rivet guns, caulking guns. Hand Drilling machines Fabrication tables Lock-forming machine Shearing machine Rolling machine PUF injection machine… Read More: Chilled Water Tank Exterior Insulation and Cladding Method of Statement »

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Automatic Chemical Dosing System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Automatic… Read More: PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM »

Safe Work Method Statement For Testing & Commissioning of DX Split Units

Below is given major sections of a safe work method of statement for Testing & Commissioning of DX Split Units. This is a normal procedure for doing testing activity. All method statement can be called safe work method statements once we attach a comprehensive risk assessment that covers all tools and equipment procedure of handling.… Read More: Safe Work Method Statement For Testing & Commissioning of DX… »

Safe Work Method Statement for Cleaning of HVAC GI Ducts & Accessories

You can find below a very precise and useful method statement for the cleaning of HVAC ducting system including steel and any other metallic air ducts. Following tools are required for the cleaning of GI ducts for HVAC Systems which should be arranged before starting the cleaning of ducting works on any type of project.… Read More: Safe Work Method Statement for Cleaning of HVAC GI Ducts… »

Standard Specifications for Installation of Pipe Hangers & Supports

PART-1 GENERAL: WORK INCLUDED: Compliance with relevant General Requirements of Mechanical Services. 1.2 DESCRIPTION OF WORK: This Section includes piping supports complete for all piping systems except as otherwise specified. 1.3 Reference Standards. Heating & Ventilating Contractors Association recommendations BS 3974 Specification for pipe supports ASME code of pressure piping B1.0 Manufacturers Standardization Society standard (MSS) Practice… Read More: Standard Specifications for Installation of Pipe Hangers & Supports »