1.0 | Obtain necessary clearances and approvals from civil engineers. |
2.0 | Inspection for clearance should be submitted and its approval to be ensured prior to start paint works. |
3.0 | Surface must be clean, dry, and from any dust. |
4.0 | Apply first coat using brush, roller or spray to achieve a uniform thickness as per manufacturers’ recommendations |
5.0 | Allow drying time as per manufacturers’ recommendation. |
6.0 | Apply second coat application uniformly by airless spray, conventional spray, high quality brush or roller |
7.0 | Allow drying time for prior to recoating |
8.0 | Inspection request to be submitted after completion of works and ensure its approval |
Method Statement for Wood Paint for MDF Skirting
Join other Readers
Join 3,556 other subscribers
Document Categories
- Civil Method Statements (83)
- Electrical Method Statements (47)
- Fire Fighting Systems (19)
- HVAC Method Statements (45)
- Occupational Health and Safety (26)
- Oil & Gas Systems (16)
- Plumbing Method Statements (41)
- Technical Guides (34)
- Testing & Commissioning (60)
Latest Posts
- Safety Procedure for Selection, Use and Inspection of Various Types of Safety Harnesses and BeltsBelow is a standard procedure that provides direction and assists… Read more: Safety Procedure for Selection, Use and Inspection of Various Types of Safety Harnesses and Belts
- Water Booster Pump Installation Specification & RequirementsThe purpose of this plumbing method statement is to describe… Read more: Water Booster Pump Installation Specification & Requirements
- Light Fixture / Light Fittings Installation Method StatementThis method statement covers the Installation of Lighting Fixtures for… Read more: Light Fixture / Light Fittings Installation Method Statement
- Confined Space Working Method Statement – Occupational health and safety ProcedureThis method statement covers working inside confined space for MEP… Read more: Confined Space Working Method Statement – Occupational health and safety Procedure
- Safety Requirements for Installation of Upper Floor Wall FramesThe sub-contractor doing the upper floor wall frames installation is… Read more: Safety Requirements for Installation of Upper Floor Wall Frames