This civil construction procedure applies to insitu industrial ground floor slabs with a tolerance of± 3mm or tighter. Prior to placing subcontract concrete order check the specification to ensure the full extent of tolerances and surface finish is understood. Concrete pouring order
Read Full Method Statement
Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work:
Read Full Method Statement
This method statement describes the procedure for installation of above ground drainage piping system. Document applies to the inward site inspection, installation and inspection methods to be adopted for the above ground drainage piping system. Project manager is overall responsible for the
Read Full Method Statement
This piping repair method statement defines and guides to painting and coating works for any kind of project or structure. This method statement is applicable to the protective painting and coating for piping and supports at any construction project site. The latest
Read Full Method Statement
Below is a basic first aid procedure that describes first aid requirements for the workplace mainly on a construction project and offices. Over all project head i.e. project manager or Project director is responsible for implementation of this standard procedure in coordination
Read Full Method Statement