Construction Vehicle and Plant Servicing Procedure

Construction Vehicle and Plant Servicing Procedure

Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work:

2021
Nov
21

Drainage Piping Above Ground Installation Plumbing Work Method of Statement

Installation and Testing of Above Ground Drainage Piping

This method statement describes the procedure for installation of above ground drainage piping system. Document applies to the inward site inspection, installation and inspection methods to be adopted for the above ground drainage piping system. Project manager is overall responsible for the

2021
Oct
31

Touchup Paint Method for Protective Painting and Coating of Piping and Supports

Touchup Paint Method for Protective Painting and Coating of Piping and Supports

This piping repair method statement defines and guides to painting and coating works for any kind of project or structure. This method statement is applicable to the protective painting and coating for piping and supports at any construction project site. The latest

2021
Oct
25

First Aid Procedure – Construction Project First Aid Kit Box Contents

First Aid Procedure - Construction Project First Aid Kit Box Contents

Below is a basic first aid procedure that describes first aid requirements for the workplace mainly on a construction project and offices. Over all project head i.e. project manager or Project director is responsible for implementation of this standard procedure in coordination