Purpose of the UPS power supply system installation is to ensure the clean & optimum power availability for the critical systems and equipment in the different area of any building or project in case of main power failure. Major equipment that are interfaced
Read Full Method Statement
Following tools shall be required to perform the installation of CCTV system. Digital Multimeter Label Printer Drill Machine Ladders Crimping Tool General Tool Box Portable Hand Tools MATERIAL HANDLING & STORAGE: CCTV material at site necessary precautions shall be taken for unloading,
Read Full Method Statement
If you are looking for commissioning report for a chiller then this page is for your below we have given many checklists or reports which are used as commissioning report for a chiller. Below lists give the checks and readings that should be made while
Read Full Method Statement
The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Building Management System BMS to ensure that the site installation work execution complies with the project requirements and serves the intended
Read Full Method Statement
Following tools shall be used for the installation of HV switchgear of 11 KV. HV Switchgear and accessories shall be in line with the approved material submittal and approved drawings by authorities and as per rules and standards. Required Tools: Fork Lift or Hydraulic Crane,
Read Full Method Statement