PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR BUILDING MANAGEMENT SYSTEM BMS

The purpose of this procedure or safe work method of statement is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Building Management System“. Through the guidelines contained herein so as to ensure that the

2015
Apr
23

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Automatic Chemical Dosing System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project

2015
Mar
24

Testing & Commissioning Method Statement Procedure for Argonite System

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Argonite System” fire suppression system. Through the the guidelines contained herein so as to ensure that the job execution complies

2015
Mar
24

Procedure For Air Handling Units Pre-Commissioning and Commissioning Method Of Statement

Below is a detailed procedure which can be used for Air Handling Units pre commissioning and commissioning activities for AHU. Pre-Commissioning Procedure For AHU Ensure that the AHU installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion

2015
Mar
21

Method Statement & Specifications For Mechanical Sound, Vibration & Seismic Control Installations

DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when