Category Archives: Civil Method Statements

Construction Methodology for Telescopic Seating System

This method statement is intended to outline the activities and the method for the Telescopic seating for auditorium or stadium seats, also known as retractable seating system. All activities will be carried out in accordance with the contract details and in full compliance to the contract specifications and project documents. All work within the rights-of-way of… Read More: Construction Methodology for Telescopic Seating System »

Steel Structure Fabrication and Metal Roofing Method Statement

This fabrication method statement covers the detailed procedure for fabrication and installation of any kind of steel structure & decking slabs. The procedure shall be read in conjunction with contract specification wherever applicable. Purpose of this procedure is to define fabrication and installation of steel structure and roof that shall be carried out under controlled conditions. Responsibility… Read More: Steel Structure Fabrication and Metal Roofing Method Statement »

Honeycomb Concrete Repair Method Statement

In order to do the honeycomb concrete repair work for structural element all necessary machines and tools shall be arranged like mixer machine, wheelbarrows, wire brush, angle grinder, measuring tapes, and other handy tools. Below is the repairing material for reference purpose, it can be any suitable equivalent local materials as per the locality of… Read More: Honeycomb Concrete Repair Method Statement »

Chasing Work on Block Wall for PVC Conduits

Following tools shall be arranged before start of the Chasing Work on Block Wall for PVC Conduits. Necessary measures will be taken for the safety of the equipment and any other works affected by the works subject of this document. Mason Trowel Wheel Barrow Plumb Joint Filler Mortar mixer Mechanical Cutter Chisel Hammer Plaster mesh… Read More: Chasing Work on Block Wall for PVC Conduits »

GRP Fins Installation Method of Statement

Below is the method for the installation of GRP Fins. Before starting the installation work for GRP fins following equipment/tools shall be arranged: Tower crane chain block spanners hammers Hilti Machine Spirit level Water level Steps for GRP Fins Installation Scaffolding should be provided in the area where fins are to be erected. Starting point… Read More: GRP Fins Installation Method of Statement »

Epoxy Paint Application Method Statement Procedure

This document describes the methodology for the application of epoxy paint for the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable safety and quality procedures, and project documents and specification. Necessary measures will be taken for… Read More: Epoxy Paint Application Method Statement Procedure »

Floating Floor System Installation Method Statement

This method statement is intended to outline the activities and the methods used for floating floor system for equipment’s like chillers etc. All activities will be carried out in accordance with the contract details and in full compliance to the Contract Specifications and Documents. All work within the rights-of-way of the local municipal governments will… Read More: Floating Floor System Installation Method Statement »