Purpose The purpose of this method statement is to define the testing and commissioning procedure of the Diesel Generators within the project. This includes pre-commissioning checks, commissioning tests and system interface tests. Scope The scope of this method statement is to define
Read Full Method Statement
PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre commissioning & commissioning of “Central Battery System” CBS through the guidelines contained herein so as to ensure that the job execution complies
Read Full Method Statement
PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “CCTV System”through the guidelines contained herein so as to ensure that the job execution complies with the project requirements
Read Full Method Statement
Pre-Commissioning Procedure for VAVs / CAVs Ensure that the VAVs / CAVs installation is complete & mechanical completion is approved. Ensure that the VAVs with 12 point flow cross type of averaging air flow sensor installed as per approved drawings. Ensure that no damage
Read Full Method Statement
The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Card Access System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements
Read Full Method Statement