2015
Apr
26

Safe Work Method Of Statement For Testing and Commissioning of Diesel Generators

Purpose The purpose of this method statement is to define the testing and commissioning procedure of the Diesel Generators within the project. This includes pre-commissioning checks, commissioning tests and system interface tests. Scope The scope of this method statement is to define

2015
Apr
25

METHOD STATEMENT FOR PRECOMMISSIONING & COMMISSIONING OF CENTRAL BATTERY SYSTEM

PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre commissioning & commissioning of “Central Battery System” CBS through the guidelines contained herein so as to ensure that the job execution complies

2015
Apr
25

PRECOMMISSIONING & COMMISSIONING METHOD STATEMENT PROCEDURE FOR CCTV SYSTEM

PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “CCTV System”through the guidelines contained herein so as to ensure that the job execution complies with the project requirements

2015
Apr
25

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR VAVs & CAVs

Pre-Commissioning Procedure for VAVs / CAVs Ensure that the VAVs / CAVs installation is complete & mechanical completion is approved. Ensure that the VAVs with 12 point flow cross type of averaging air flow sensor installed as per approved drawings. Ensure that no damage