Method Statement For Installation Of Central Battery System CBS & Panels

Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material  On receipt of the Central Battery System and accessories at site, necessary precautions shall be taken for… Read More »

Testing & Commissioning Of Water Supply Piping System Network

Precommissioning Procedure for Water supply system Ensure that the system installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion & precommissioning. Check that the Water Booster piping network is complete with proper valves, water hammer arrester drains, vents, strainers, pressure switches & instruments in place as per final approved shop drawing. Ensure… Read More »

Testing & Commissioning Of Water Booster Pump Set – Method Statement

The purpose of this safe work method of statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of domestic Water Booster Pumps through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory… Read More »

VESDA System Testing and Commissioning Method Of Statement

List of tools required for VESDA system testing and commissioning which should be arranged before starting the work. Portable Hand tools Step Ladder Insulation Resistance Tester Continuity tester Precommissioning Procedure for VESDA System Check the location of installation of the panel is as per the manufacturer’s recommendation & approved shop drawings. Check the mounting height of… Read More »

Testing & Commissioning Of UPS System – Method Statement

The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. The UPS system provides continuous, regulated AC power to the loads under normal and abnormal conditions, including loss of the utility AC power.… Read More »

Method Statement For Fluke Testing & Commissioning Of Telephone Data System

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System through the guidelines contained herein so as to ensure that the electrical job execution complies with the project requirements and serves the intended function to satisfactory level of… Read More »

Testing & Commissioning of Sump Pump Sets

Below is a step wise method of statement for Testing & Commissioning of Sump Pump Sets. Precommissioning Procedure for Sump Pumps Ensure that the pump installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion & precommissioning. Repair all damages to the equipment paint finish. Ensure that the pumps are identified location… Read More »

Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s

The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning Of Starter Panels  Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. TOOLS /… Read More »

Testing & Commissioning Procedure For Staircase Pressurisation System

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of  Staircase Pressurisation System through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Staircase Pressurisation… Read More »