Testing & Commissioning Of Submain Distribution Boards SMDB’s

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of submain Distribution Boards SMDB’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools for SMDB… Read More »

Method Statement For Testing & Commissioning of Sanitary Wares

This method statement is to define the step by step procedure to implement the correct practices for the precommissioning & commissioning of Sanitary wares through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Sanitary wares Ensure that the… Read More »

Testing & Commissioning Of Chilled Water Pressurization Units

The purpose of this procedure or safe work method of statement is to define the step by step method to implement the correct practices for the testing, precommissioning & commissioning of Pressurization units. Site team should follow through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the… Read More »

Space Noise Level Measurement Method Of Statement

The purpose of this method statement procedure is to define the step by step method to implement the correct practices for the Noise Level Measurement through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Checks prior to start of Noise Level… Read More »

Testing & Commissioning of Motor Control Center – Method Statement

The purpose of this safe work method of statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Motor Control Center through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level.… Read More »

Method Statement For Testing & Commissioning of LV Switchgear Panels

The purpose of this method of statement is to explain step by step method to implement the correct practices for the precommissioning, testing & commissioning of “LV Switchgear”through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Required Instruments & Tools Portable… Read More »

Lightning Protection System Testing & Commissioning Method Statement

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning, testing & commissioning of Lightning Protection System through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools & Instruments:… Read More »

Lighting Control System Testing & Commissioning Procedure

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Lighting Control System”through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. TOOLS / EQUIPMENT Portable Hand tools… Read More »

Method Statement For Testing & Commissioning Of Light Fittings & Fixtures

Below is a complete method statement for testing and commissioning of Light Fittings as required by the project requirements and light fittings serve the intended function to satisfactory level and achieve the required lux/lumix levels in all areas. Required Tools & Instruments Portable Hand tools Step Ladder Insulation Tester Multimeter Lux meter Precommissioning Procedure for Light Fittings… Read More »

Method Statement For Testing & Commissioning Of Leak Detection System

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Leak Detection System through the guidelines contained herein. Ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Tools & Equipment Required: Portable Hand tools Step… Read More »