Below is given the method statement or procedure for the safe work of block works. Ensure all Clearances and approval from the concerned are obtained. Selected working area should be barricaded to avoid accidents & damages. Verify all requirements as per required in
Read Full Method Statement
Below is a brief method of statement for the installation of gypsum ceiling work in simple steps which can be followed for easy understanding and sequencing the works. Before starting the false ceiling installation works obtain necessary clearances and approvals from all
Read Full Method Statement
We have given below a method statement for the protection of the existing trees on the project site. This is in many cases required to protect the trees and any other natural object that would be required permanently during and after the project
Read Full Method Statement
Below is the safe work method statement for the installation of tower crane foundation or tower crane base. The installation will be as per the approved tower crane foundation drawings and details which is mostly different for different types of tower cranes,
Read Full Method Statement
The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures
Read Full Method Statement