This method statement describes the procedure for installation of above ground drainage piping system. Document applies to the inward site inspection, installation and inspection methods to be adopted for the above ground drainage piping system. Project manager is overall responsible for the
Read Full Method Statement
This piping repair method statement defines and guides to painting and coating works for any kind of project or structure. This method statement is applicable to the protective painting and coating for piping and supports at any construction project site. The latest
Read Full Method Statement
This plumbing method statement describes the procedure for the sump pump installation. The purpose of the method statement is to ensure that work is undertaken safely, in compliance with the contract requirements and to the specified project quality requirements. Project plumbing engineer
Read Full Method Statement
This safework procedure helps to provide guidance in carrying out the necessary measures to avoid flooding during testing and commissioning activities at the construction project. Purpose of this method statement is to control the water flooding that may occur during commissioning activities.
Read Full Method Statement
The purpose of this safework method statement is to establish the work method for supply and installation of mild steel pipes, fittings and pipe works under the water reticulation work for project buildings, landscape, infrastructure and associated works. Upon delivery at site,
Read Full Method Statement