Method Statement For Installation Of Firefighting Pump Set

Upon arrival at site, the Fire Fighting pumps shall be off-loaded carefully at site using necessary manpower and required equipment to ensure that no damage is caused. The Fire Fighting pumps shall be preferably shifted directly to the pump room immediately upon arrival at site. On the floor, Fire Fighting pumps will be stored in a clean,… Read More: Method Statement For Installation Of Firefighting Pump Set »

Method Statement For Installation Of Steam Boilers

Following tools or equipment shall be arranged for the installation of steam boiler. Fork lift or Crane with capacity & arrangement ( strap ) in line with manufacturer’s recommendations. Portable hand tools, Spirit Level / Level Threads Drill Machine / Hammering Machine MATERIAL HANDLING & STORAGE On receipt of the Steam Boilers and accessories at site,… Read More: Method Statement For Installation Of Steam Boilers »

Method Statement for the Installation of Calorifier

Below is step wise procedure or method statement for the installation of calorifier. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required materials are… Read More: Method Statement for the Installation of Calorifier »

Ductwork Method Statement For Installation of HVAC Supply, Return & Exhaust Ducts, Dampers, Fire Dampers and Access Doors

The purpose of this mechanical HVAC method statement is to elaborate various work procedures which explains and covers the ductwork installation of HVAC Supply / Return / Exhaust Ducts, Dampers, Fire Dampers and Access Doors. It is overall the responsibility of project HVAC engineer and his team to implement this duct work method statement, ITP… Read More: Ductwork Method Statement For Installation of HVAC Supply, Return &… »

Installation, Pressure Testing, Insulation & Cladding of Chilled Water Piping Valves and Accessories

1. PURPOSE The purpose of generating this mechanical method statement is to define the procedure step by step to implement the correct practices for Installation, Pressure Testing, Insulation and cladding of Chilled Water Piping network including valves and accessories. Following the the guidelines contained herein shall ensure that the job execution complies with the project… Read More: Installation, Pressure Testing, Insulation & Cladding of Chilled Water Piping… »