1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for welding at project site. 2. SCOPE : This Method Statement refers to various work procedures contained within project control documents, which explains
Read Full Method Statement
Below is a safework method of statement that covers first the production of wall panels in a precast factory and then erection of precast concrete boundary wall for any kind of the project. In a precast factory moulds are used for casting
Read Full Method Statement
Below is given the method statement or procedure for the safe work of block works. Ensure all Clearances and approval from the concerned are obtained. Selected working area should be barricaded to avoid accidents & damages. Verify all requirements as per required in
Read Full Method Statement
The purpose of this document is to establish standard instruction for the safe handling, storage and disposal of hydrocarbons at a Project. Instruction should apply to all departments involved in the handling of hydrocarbons for a project or an organization. Identified Hydrocarbons
Read Full Method Statement
Below is a brief method of statement for the installation of gypsum ceiling work in simple steps which can be followed for easy understanding and sequencing the works. Before starting the false ceiling installation works obtain necessary clearances and approvals from all
Read Full Method Statement