The purpose of this method statement is to describe the detailed procedure to be followed for the installation, testing and commissioning of Elevator (Lift) at the construction project site. This method statement is prepared also to ensure that concerned persons are familiar
Read Full Method Statement
Required Tools/Equipment Multimeter Detector Testing Tool Hilti Machine Drill Machine Pull string Step Ladders Mobile Scaffold Preparation Work Before Installation With the aid of computer software program design the system and prepare isometric drawing. Prepare layout drawing of piping network system and mechanical
Read Full Method Statement
Below is a brief method statement for installation & testing of Liquefied Petroleum Gas LPG Piping System including the tank. LPG System shall be installed & tested by specialist supplier approved for the project. Ensure all civil works are completed for the
Read Full Method Statement
This statement provide a method for the cleaning, flushing and passivation for the HVAC chilled water system in the site itself to be followed by the third or independent party. Objective The objective of cleaning, flushing and passivation is to remove debris
Read Full Method Statement
If you are looking for commissioning report for a chiller then this page is for your below we have given many checklists or reports which are used as commissioning report for a chiller. Below lists give the checks and readings that should be made while
Read Full Method Statement