2025
Jan
15

Argonite Fire Suppression System Testing & Commissioning Method Statement

The purpose of this procedure is to define step by step the method for the precommissioning & commissioning of argonite fire suppression system. Testing and commissioning parameters shall be as per the specific project requirements, specifications and applicable local and international standards.

2025
Jan
7

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Automatic Chemical Dosing System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project

2025
Jan
1

Excavation Method Statement

Below is excavation swms safe work method statement for performing the excavation work for different purposes like piping, service trenches, manhole and cable laying including building construction work etc. The procedure is given in main steps and other considerations must be kept

2024
Dec
27

Safe Work Method Statement For Back Filling Of Excavated Area / Trench

Safe work method statement for back filling of the excavation area is provided in steps as below. Ensure all clearances from the concerned Government Department obtained. Selected working area should be barricaded to avoid accidents. Ensure suitable access / safe ramps provided